Puowaina Bridge Slope Stabilization
- Published in Commercial Drilling Projects
Due to continuing erosion over the years, the "uphill" abutment for this critical link to the Tantalus/Round Top residential area needed to be stabilized and protected. Repair plans called for construction of an structural shotcrete facing to prevent any escalation of the erosion and undermining of the abutment