Iolani School
- Published in Commercial Drilling Projects
Expansion at a prominent local private college-prep academy included construction of a deep foundation system. Our crews installed micro-piles to an average depth of 120 feet. A down-the-hole (DTH) hammer simultaneously drilled and installed casing to the required final depths as monitored by the owner’s geotechnical/field engineer.